ISET Tower, Russian Federation

Project data

  • residential and office building with 52 storeys, total height of 209 m
  • circular structure with centrally-arranged core
  • varying number and dimensions of elevator shafts within the core likewise with circular ground plan

Requirements

  • fast and safe construction work for circular design, very high wind loads and high fresh concrete pressure
  • self-climbing solution also for elevator shafts with compact dimensions
  • flexible adjustment to changing ground plan layouts and storey heights

Customer

Ekaterinburg-City, Ltd.

Customer's benefit

  • minimization of crane use
  • easy, site-compliant and fast adaption of the self-climbing formwork to the changing shaft layout
  • fastforming of the circular walls with customized special forms
  • safe working conditions also at great heights and with strong winds
Golovin Evgeniy Borisovich
Chief Engineer

We decided to use the proven PERI self-climbing formwork systems, because they are easy to handle and ensure complete safety in high-rise construction. PERI specialists have consistently provided us with operational support.

PERI solution

  • combination of different ACS self-climbing formwork systems and RCS rail-guided climbing system
  • implementation solution with simple conversion of the self-climbing formwork for different shaft dimensions
  • special elements on the basis of the VARIO GT 24 girder wall formwork
  • all-round protection provided by the RCS climbing protection panel on the outside edge of the building