Sasol Head Office

Project data

Location: Johannesburg, South Africa

The versatility, ease and lightweight nature of SKYDECK proved to be invaluable given the tight construction schedule.

Requirements

A complex structure with expanding footprint from ground to top floor, in total comprising seven basement levels and ten floors above ground.

Customer

Aveng Grinaker–LTA

Customer's benefit

The introduction of different PERI elements for the slab construction allowed the decking crews to get through the complex structure with minimum hassle. 

Sasol Head Office, Timothy Rowbottom,  Aveng Grinaker–LTA Contracts Manager
Timothy Rowbottom
Contracts Manager

SKYDECK effectively addresses the issues of time, quality and cost. It is extremely versatile and can be adapted to accommodate just about any decking issue.

PERI solution

The vertical formwork elements were designed with PERI’s successful TRIO system. All shafts – at one stage more than 12 in number – used TRIO panels.